[1]刘增训,陈典,吕鸣镝,等.长距离长链式弱系统无功配置优化研究[J].电力电容器与无功补偿,2020,41(5):67-73.[doi:10.14044/j.1674-1757.pcrpc.2020.05.012]
 LIU Zengxun,CHEN Dian,LYU Mingdi,et al.Study on Reactive Allocation Optimization of Long Distance and Long Chain Weak System[J].Power Capacitors & Reactive Power Compensation,2020,41(5):67-73.[doi:10.14044/j.1674-1757.pcrpc.2020.05.012]
点击复制

长距离长链式弱系统无功配置优化研究()
分享到:

《电力电容器与无功补偿》[ISSN:1674-1757/CN:61-1468/TM]

卷:
41卷
期数:
2020年第5期
页码:
67-73
栏目:
无功补偿与滤波
出版日期:
2020-10-30

文章信息/Info

Title:
Study on Reactive Allocation Optimization of Long Distance and Long Chain Weak System
作者:
刘增训1陈典2吕鸣镝3肖景良4秦晓辉2
1. 国家电网有限公司,北京100031;2. 中国电力科学研究院有限公司电网安全与节能国家重点实验室, 北京100192;3. 国网黑龙江省电力有限公司,哈尔滨150090; 4. 中国电力工程顾问集团东北电力设计院有限公司,长春130021
Author(s):
LIU Zengxun1CHEN Dian2LYU Mingdi3XIAO Jingliang4QIN Xiaohui2
1. State Grid Corporation of China,Beijing 100031,China;2. State Key Laboratory of Power Grid Safety and Energy Conservation,China Electric Power Research Institute,Beijing 100192,China; 3. State Grid Heilongjiang Electric Power Co.,Ltd.,Harbin 150090,China; 4. China Power Engineering Consulting Group Northeast Electric Power Design Institute Co.,Ltd., Changchun 130021,China
关键词:
长距离长链式弱系统无功优化
Keywords:
long distancelong chainweak systemreactive optimization
DOI:
10.14044/j.1674-1757.pcrpc.2020.05.012
文献标志码:
A
摘要:
黑河电网位于黑龙江电网北部末端,通过长距离线路及长链式结构与主网连接,同时承担着 俄罗斯电力受入。系统短路容量较低,输电功率波动较大,沿线电压呈中间高、两端低变化趋势,且压 差较大。500 kV 安北变的建设进一步增加了长链式电网长度,导致系统无功电压控制更加困难。本文 从工程运行实际出发,综合考虑正常、检修、充电及附加一重故障等多种运行方式需要,提出长距离、 长链式、弱系统无功配置优化原则、流程、方法,并对安北500 kV 输变电工程进行无功配置方案优化。
Abstract:
Heihe power grid is located in the end of north Heilongjiang power grid and is connected to the main grid through a long line and long chain structure and,at the same time,is responsible for the Russian power injection. The short circuit capacity of this system is low while the transmission power fluctuation is large. The voltage along the line shows such trend as low on the both ends but high in the middle and the difference of voltage is high. The construction of 500 kV Anbei station increases length of long?chain grid further,causing the reactive voltage of the system more difficult to be controlled. In this paper,starting from the actual operation and with comprehensive consideration of the need of multiple operation mode such as normality,maintenance,charge and a heavy fault,the principle,process and method of reactive power opti? mization of long distance,long?chain and weak system are proposed. And the reactive optimization plan of Anbei 500 kV power transmission and transformation project is optimized.

参考文献/References:

[1] 邹欣,蒋维勇,李亚男. ±800 kV酒泉—湖南特高压直流 工程无功补偿优化配置方案[J]. 电力建设,2015,36 (9):43?49. ZOU Xin,JIANG Weiyong,LI Yanan. Reactive power con? figuration scheme of ± 800 kV Jiuquan ? Hunan UHVDC project[J].ElectricPowerConstruction,2015,36(9):43?49.
[2] 黄镔,许婧,程旻,等. 220 kV及以下电网感性无功补偿 容量初探[J]. 电网技术,2009,33(19):148?151. HUANG Bin,XU Jing,CHENG Min,et al. Preliminary study on the inductive reactive compensation capacity for power grids in 220 kV and lower voltage grades [J]. Power System Technology,2009,33(19):148?151.
[3] 卫鹏,周前,陈哲,等. 500 kV变电站无功平衡配置实用 化简化计算方法及案例分析[J]. 电力电容器与无功补 偿,2018,39(1):1?6. WEI Peng,ZHOU Qian,CHEN Zhe,et al. Practical and simplified calculation method and case analysis on reactive power balance allocation for 500 kV substation [J]. Power Capacitor&ReactivePowerCompensation,2018,39(1):1?6.
[4] 楼伯良,杨少杰,叶琳,等. 大容量无功补偿装置在浙江 受端电网的落点优选方法[J]. 广东电力,2019,32(10): 96?101. LOU Bailiang,YANG Shaojie,YE Lin,et al. Optimization method for large capacity reactive power compensation de? vice in Zhejiang receiving end power grid [J]. Guangdong Electric Power,2019,32(10):96?101.
[5] 戴武昌,陈东魁,张威,等. 大容量远距离交流输电系统 无功平衡及稳态电压控制[J]. 电网技术,2013,37(4): 1101?1105. DAI Wuchang,CHEN Dongkui,ZHANG Wei,et al. Reac? tive power balance and steady voltage control of large?scale long?distance AC transmission system [J]. Fudan Interna? tional Studies Review,2013,37(4):1101?1105.
[6] 马永翔,孙荔伟,闫群民,等. 基于双馈风力发电系统的 无功补偿优化研究[J]. 电力电容器与无功补偿,2019, 40(4):152?156. MA Yongxiang,SUN Liwei,YAN Qunmin,et al. Study on reactive power compensation optimization based on doubly? fed wind power generation system [J]. Power Capacitor & Reactive Power Compensation,2019,40(4):152?156.
[7] 栗然,唐凡,刘英培,等. 双馈风电场新型无功补偿与电压控制方案[J]. 中国电机工程学报,2012,32(19):16?23. LI Ran,TANG Fan,LIU Ying?pei,et al. A new scheme of reactive power compensation and voltage control for DFIG based wind farm [J]. Proceedings of the CSEE,2012,32 (19):16?23.
[8] 胡臻,崔挺,呙虎,等. 考虑电网动态特性的无功补偿配 置方案[J].电力系统及其自动化学报,2019,31(10):45?51. HU Zhen,CUI Ting,GUO Hu,et al. Reactive power com? pensation scheme considering dynamic characteristics of power system [J]. Proceedings of the CSU?EPSA,2019,31 (10):45?51.
[9] 崔惟,颜伟,WEI?JEN L,等. 考虑区域无功平衡的主导 节点选择和无功分区的优化方法[J]. 电网技术,2017, 41(1):168?174. CUI Wei,YAN Wei,WEIJEN L,et al. Optimal pilotbus se? lection and network partitioning algorithm considering zon? al reactive power balance [J]. Power System Technology, 2017,41(1):168?174.
[10]杨婧婧,刘洪顺,何东欣,等. 特高压混合无功补偿对单 相接地故障开断特性的影响研究[J]. 中国电机工程学 报,2019,39(23):7083?7092. YANG Jingjing,LIU Hongshun,HE Dongxin,et al. The influ? ence of UHV hybrid reactive power compensation on inter? rupting characteristics in the single phase?ground fault[J]. Proceedings of the CSEE,2019,39(23):7083?7092.
[11]官澜,刘菲,文卫兵,等. 特高压交流变电站无功补偿装 置直接接入500 kV母线方案研究[J]. 中国电力,2019, 52(8):98?104. GUAN Lan,LIU Fei,WEN Weibing,et al. Research on re? active power compensation device in UHV AC substation connected directly to 500 kV busbar [J]. Electric Power, 2019,52(8):98?104.
[12]殷威扬,杨志栋. 特高压直流工程无功平衡和补偿策略[J]. 高电压技术,2006,32(9):50?54. YAN Weiyang,YANG Zhidong. Study on reactive power balance and compensation strategy for UHVDC project [J]. High Voltage Engineering,2006,32(9):50?54.
[13]邹洪森,惠子珈,刘志远,等. 直流送端换流站无功控制 策略的优化研究[J]. 电力电容器与无功补偿,2019,40 (5):66?73. ZOU Hongsen,XI Zijia,LIU Zhiyuan,et al. Study on opti? mization of reactive power control strategy for DC sending converter station [J]. Power Capacitor & Reactive Power Compensation,2019,40(5):66?73.
[14]秦晓辉,郭强,周勤勇,等. 一种无功平衡与临界潮流快速 分析方法及其在特高压可控高抗需求分析中的应用[J]. 中国电机工程学报,2013,33(19):102?110. QIN Xiaohui,GUO Qiang,ZHOU Qinyong,et al. Fast anal? ysis method of reactive power balancing and critical power flow and application to study controllable shunt reactors re? quirement in UHV grid [J]. Proceedings of the CSEE, 2013,33(19):102?110.
[15]LIU Liming,HUI Li,XUE Yaosuo,et al. Reactive power compensation and optimization strategy for grid?interactive cascaded photovoltaic systems [J]. IEEE Transactions on Power Electronics,2015,30(1):188?202.
[16]CHEN S X,EDDY Y,GOOI H B,et al. A centralized reac? tive power compensation system for LV distribution net? works [J]. IEEE Transactions on Power Systems,2015,30 (1):274?284.
[17]刘振亚,张启平,王雅婷,等. 提高西北新甘青750 kV送 端电网安全稳定水平的无功补偿措施研究[J]. 中国电 机工程学报,2015,35(5):1015?1022. LIU Zhenya,ZHANG Qiping,WANG Yating,et al. Research on reactive compensation strategies for improving stability level of sending?end of 750 kV grid in northwest China [J]. Proceedings of the CSEE,2015,35(5):1015?1022.
[18]周勤勇,张彦涛,贺海磊,等. 多直流馈入电网动态无功 补偿选点实用方法[J]. 电网技术,2014,38(7):1753?1757. ZHOU Qinyong,ZHANG Yantao,HE Hailei,et al. A prac? tical site selection method for dynamic reactive power com? pensation in multi?infeed DC power grid [J]. Power System Technology,2014,38(7):1753?1757.
[19]赵云灏,夏懿,周勤勇,等. 风火打捆直流外送系统的直 流系统无功补偿装置协调控制策略及配置方案[J]. 电 网技术,2016,40(7):2081?2086. ZHAO Yunhao,XIA Yi,ZHOU Qinyong,et al. Coordinat? ed control strategy and configuration scheme of RPCD of DC system for wind?thermal?bundled power transmission [J]. Power System Technology,2016,40(7):2081?2086.
[20]董萍,徐良德,刘明波. 多站点无功补偿装置的多目标协 调控制[J]. 中国电机工程学报,2014,34(4):587?595. DONG Ping,XU Liangde,LIU Mingbo. Multi?objective co? ordinated control of reactive compensation devices among multiple substations [J]. Proceedings of the CSEE,2014,34 (4):587?595.

备注/Memo

备注/Memo:
收稿日期:2020?02?28
作者简介: 刘增训(1979—),男,高级工程师,主要从事电网规划与 设计研究工作。 陈典(1990—),男,工程师,主要从事电力系统安全稳定 计算分析、规划计算、电力系统生产模拟工作。 吕鸣镝(1967—),男,高级工程师,主要从事电力系统规 划与电网项目可研管理工作。 肖景良(1983—),男,高级工程师,主要从事电力系统规 划与设计工作。 秦晓辉(1979—),男,教授级高级工程师,主要从事电力 系统规划运行控制与新技术应用研究工作。