您当前的位置:
首页 >
文章列表页 >
Technology Innovation and Operation Analysis of 110kV Shunt Capacitor Bank in Changzhi 1000kV Ultra-high Voltage Station
更新时间:2024-09-14
    • Technology Innovation and Operation Analysis of 110kV Shunt Capacitor Bank in Changzhi 1000kV Ultra-high Voltage Station

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Vol. 30, Issue 3, Pages: 9-13(2009)
    • CLC: TM53
    • Published:2009,

    移动端阅览

  • XU PENG, LI ZHONG-QUAN, QIN YAN-WEI. Technology Innovation and Operation Analysis of 110kV Shunt Capacitor Bank in Changzhi 1000kV Ultra-high Voltage Station. [J]. Power capacitor & reactive power compensation, 2009, 30(3): 9-13. DOI:

  •  
  •  

0

Views

161

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Simulation of Switching Re-ignition Over-voltage of Capacitor Bank Based on Series Resistance Switch
A New Method to Suppress the Switching Overvoltage in Shunt Capacitor Bank
Influence of Shunt Reactive Compensation Installation on the Harmonic in Electrified Network
The Highest Permit Voltage of High Voltage Shunt Capacitor
Development of UHVAC 1000kV Capacitor Voltage Transformer

Related Author

WANG Xuesong
YUE Yonggang
LYU Xin
ZHANG Qingru
WANG Chao
ZHANG Liguo
YANG Lanjun
LI Liu-ling

Related Institution

School of Electrical Engineering, Xi'an Jiaotong University
Inner Mongolia EHV Power Supply Company
  西安交通大学电气学院 西安710049  
Xi’an Jiaotong University
Anhui Province Electric Co., Huaibei Power Supply Bureau
0