您当前的位置:
首页 >
文章列表页 >
Selection Principle and Basis of Overvoltage Multiple of the Protection Matching Element of Capacitor with Internal Fuse
更新时间:2024-09-14
    • Selection Principle and Basis of Overvoltage Multiple of the Protection Matching Element of Capacitor with Internal Fuse

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Issue 3, Pages: 1-3(2008)
    • CLC: TM53
    • Published:2008,

    移动端阅览

  • NI XUE-FENG1, JIANG SHENG-BAO1, LIN HAO1, et al. Selection Principle and Basis of Overvoltage Multiple of the Protection Matching Element of Capacitor with Internal Fuse. [J]. Power capacitor & reactive power compensation, 2008, (3): 1-3. DOI:

  •  
  •  

0

Views

134

下载量

24

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Discussion on Manufacture of Extended-foil Type High-voltage Shunt Capacitor with Internal Fuse Protection
Test Verification of Capacitor Internal Fuse Used in HVDC Transmission Project
Simulation of Capacitor Internal Fuses
Discussion on High Voltage Internal Fuse Capacitor
Elimination Protection Malfunction by Removal of External Fuse

Related Author

Ma Lihua
LIU Bing
WANG Hong-peng
GU Jin-song
YAO Cheng
ZHAO Hong-wei
HU Wei
YAO Cheng

Related Institution

NISSIN Electric Wuxi Power Capacitor Company Limited
New Northeast Electric
  新东北电气(锦州)电力电容器有限公司 辽宁锦州121000  
Xi′an XD Power Capacitor Co.,Ltd,Xi′an
Xi’an XD Power Capacitor Co., Ltd.
0