您当前的位置:
首页 >
文章列表页 >
Design and Debugging on the Capacitor Bank of San-hu 500kV HVDC Project
更新时间:2024-09-14
    • Design and Debugging on the Capacitor Bank of San-hu 500kV HVDC Project

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Issue 2, Pages: 33-36(2007)
    • CLC: TM53
    • Published:2007,

    移动端阅览

  • YAO CHENG, ZHAO JUN, ZHANG XIN-WEI, et al. Design and Debugging on the Capacitor Bank of San-hu 500kV HVDC Project. [J]. Power capacitor & reactive power compensation, 2007, (2): 33-36. DOI:

  •  
  •  

0

Views

90

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

The Deduction and Analysis of the Protection Formula of the Neutral Unbalanced Current in Double-star Connection
Design and Debugging on the Capacitor Bank for Yun—Guang HVDC Project
The Influence of Distributed Capacitance on Initial Unbalance Current of H Type Protection
Calculation and Adjustment on the Unbalance Neutral Electric Current Y-Y Connected Capacitors
Practical Calculation and Simulation Analysis on the Unbalance Neutral Current in Y-Y Connected Capacitor Bank

Related Author

HE Yu
WANG Wei
CHANG Ju-min
ZHAO Jun
ZHANG Chang-yu
YANG Xiao-liang
HUANG Xuan
GUO Qing-wen

Related Institution

Suzhou Power Capacitor Co.,Ltd
Xi’an XD Power Capacitor Co., Ltd.
Xi’an ABB Power Capacitor Company Ltd.
Zhaoqing Huaiji Power Supply Bureau,Guangdong Power Grid Corporation,Huaiji
China Electric Power Research Institute
0