Discussion on First Commissioning Failure in Offshore Wind Power Station
Application Technology in the Field of Clean Energy | 更新时间:2025-07-02
    • Discussion on First Commissioning Failure in Offshore Wind Power Station

    • Power Capacitor & Reactive Power Compensation   Vol. 46, Issue 3, Pages: 106-112(2025)
    • DOI:10.14044/j.1674-1757.pcrpc.2025.03.014    

      CLC:
    • Received:16 December 2024,

      Published:25 June 2025

    移动端阅览

  • LIU Gengen, WEI Junmei, BAI Wei, et al. Discussion on First Commissioning Failure in Offshore Wind Power Station[J]. Power capacitor & reactive power compensation, 2025, 46(3): 106-112. DOI: 10.14044/j.1674-1757.pcrpc.2025.03.014.

  •  
  •  

0

Views

2

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Grid-connected Technology of Offshore Wind Power Based on Self-starting System
Reactive Power Configuration Method of Offshore Wind Power with Access of AC Submarine Cable

Related Author

WANG Liang
LIU Yanan
LIU Qiang
YU Jian
YANG Chun
CAO Jiawei
WU Xi
LUO Hongmei

Related Institution

Jiangsu Frontier Electric Technology Co., Ltd.
China Guangdong Nuclear Engineering Co., Ltd.
School of Electrical Engineering, Southeast University
China Electric Power Research Institute
State Grid Zhejiang Electric Power Company
0