您当前的位置:
首页 >
文章列表页 >
Analysis on Heating of AC Filter Capacitor Connection Terminal at UHV Converter Station
Reactive Power Compensation and Filter | 更新时间:2025-09-03
    • Analysis on Heating of AC Filter Capacitor Connection Terminal at UHV Converter Station

    • Power Capacitor & Reactive Power Compensation   Vol. 46, Issue 4, Pages: 65-70(2025)
    • DOI:10.14044/j.1674-1757.pcrpc.2025.04.008    

      CLC:
    • Received:24 March 2025,

      Published:25 August 2025

    移动端阅览

  • LIU Huachen, LI Shuang, WANG Hailong, et al. Analysis on Heating of AC Filter Capacitor Connection Terminal at UHV Converter Station[J]. Power capacitor & reactive power compensation, 2025, 46(4): 65-70. DOI: 10.14044/j.1674-1757.pcrpc.2025.04.008.

  •  
  •  

0

Views

1

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Fault Analysis and Consideration on AC Filter Capacitor at UHV Converter Station
Study on Unbalance Protection Setting of AC Filter Capacitor Bank in UHV Converter Station
Overvoltage and Overcurrent Analysis of Capacitor of High-voltage C1 Capacitor Bank Layer of AC Filter as Bird Damage
Study on Design and Reactive Power Compensation of AC Filter for Multi-terminal DC Transmission Project
Study on Unbalance Protection Fault of AC Filter Capacitor Bank of UHV Converter Station

Related Author

ZHANG Zhaohui
XU Jiangtao
LIU Ziquan
XU Yang
HU Chengbo
TAO Fengbo
MA Yong
JIANG Jincheng

Related Institution

State Grid Jiangsu Electric Power Co.,Ltd.,Electric Power Research Institute
State Grid Xinjiang Electric Power Research Institute
State Grid Xinjiang EHV Branch
State Grid Technical and Economic Research Institute Co.,Ltd.
Guilin Power Capacitor Co.,Ltd.
0