Principle and Experimental Study of Primary Frequency Regulation Device in Wind Farms
- 风电场一次调频装置原理及试验研究
- Vol. 47, Issue 2, Pages: 45-51(2026)
DOI:10.14044/j.1674-1757.pcrpc.2026.02.005
移动端阅览


浏览全部资源
扫码关注微信
Xi'an Thermal Power Research Institute Co., Ltd., Xi'an 710000, China
Received:01 December 2025,
Revised:2025-12-22,
Published:25 April 2026
移动端阅览
WANG Zhigao, MEN Yuxi, ZHANG Enxiang, et al. Principle and Experimental Study of Primary Frequency Regulation Device in Wind Farms[J]. Power Capacitor & Reactive Power Compensation, 2026, 47(2): 45-51.
WANG Zhigao, MEN Yuxi, ZHANG Enxiang, et al. Principle and Experimental Study of Primary Frequency Regulation Device in Wind Farms[J]. Power Capacitor & Reactive Power Compensation, 2026, 47(2): 45-51. DOI: 10.14044/j.1674-1757.pcrpc.2026.02.005.
近年来,西北电网新能源快速发展,外送规模不断扩大,当电网频率扰动时,新能源场站能够参与电网一次调频,提供频率支撑,其大送端、大枢纽的作用进一步凸显。本文结合青海省某200MW风电场的实例,说明了风电场一次调频装置的工作机理和考核机制,以及西北电网风电场一次调频试验方法,包括频率阶跃扰动试验和自动发电量控制(automatic generation control,AGC)协调试验。结果表明,风电场可参与电网快速频率响应,响应特性符合要求,验证了该试验方法考核风电场一次调频能力的有效性,为类似试验提供了参考和借鉴作用。
In recent years,new energy in the Northwest Power Grid in China has developed raidly,and the scale of power transmission has continuously expended. When the frequency of the power grid is disturbed, the new energy station can participate in the primary frequency regulation of the power grid and provide frequency support. The role of its large transmission terminal and major hub is further highlighted. Based on the example of a 200MW wind farm in Qinghai Province of China,in this paper the working mechanism and assessment mechanism of the primary frequency regulation device of the wind farm,the primary frequency regulation test method of the wind farm in the Northwest power grid of China,including the frequency step disturbance test and AGC coordination test,are introduced. The results show that the wind farm can participate in the rapid frequency response of the power grid,and the response characteristics meet the requirements. The effectiveness of the test method for assessing the primary frequency regulation capacity of wind farms is verified,which has provided reference for similar tests.
王菲菲. 2024年青海省新增清洁能源装机突破1500万千瓦[N].青海日报,2025-01-03.
汝冬,蔺红.改善惯性响应与一次调频的风电全直流系统协调控制策略[J].电力工程技术,2024,43(3):52-62.
RU Dong,LIN Hong. Coordinated control strategy for improving inertial response and primary frequency modulation in wind power full DC system[J]. Electric Power Engineering Technology,2024,43(3):52-62.
席云烽,唐超,黄云辉,等.风电接入弱送端柔直系统次同步振荡主导模式及参与因子分析[J].电测与仪表, 2024,61(12):125-132.
XI Yunfeng,TANG Chao,HUANG Yunhui,et al. Dominant mode and participation factor analysis of sub-synchronous oscillation of wind power connected to weak transmission end of the flexible HVDC system[J]. Electrical Measurement & Instrumentation,2024,61(12):125-132.
蔡钰泽,胡畔,曹侃,等.考虑预留功率的无储能构网型光伏机组控制策略[J].浙江电力,2024,43(12):77-85.
CAI Yuze,HU Pan,CAO Kan,et al. A control strategy for GFM photovoltaic units without energy storage considering reserved power[J]. Zhejiang Electric Power,2024,43(12):77-85.
杨葆鑫,邢文奇,刘鹏飞,等.基于直流电压前馈的构网型光伏稳定性优化控制策略[J].高压电器,2024,60(12):213-222.
YANG Baoxin,XING Wenqi,LIU Pengfei,et al. Optimal control strategy of stability for grid-forming photovoltaic based on DC voltage feedforward[J]. High Voltage Apparatus,2024,60(12):213-222.
蔡阳,刘子瑞,黄颖茜,等.相变蓄热对光伏相变复合围护结构隔热及发电性能的影响[J].西安工程大学学报, 2024,38(5):117-125.
CAI Yang,LIU Zirui,HUANG Yingxi,et al. Effect of phase change heat storage on thermal insulation and power generation performance of photovoltaic phase change composite envelope structure[J]. Journal of Xi'an Polytechnic University,2024,38(5):117-125.
陈君,王博士,肖媛,等.基于Informer模型的短期光伏发电功率预测[J].西安工程大学学报,2025,39(4):82-88.
CHEN Jun,WANG Boshi,XIAO Yuan,et al. Short-term photovoltaic power forecasting based on the informer model [J]. Journal of Xi'an Polytechnic University,2025,39(4):82-88.
蔡晖,张文嘉,彭竹弈,等.基于大规模风电机组的虚拟惯量控制技术对江苏电网频率稳定性的影响研究[J].电力电容器与无功补偿,2021,42(4)41-46.
CAI Hui,ZHANG Wenjia,PENG Zhuyi,et al. Influence of large scale wind turbine-based virtual inertia control technology on frequency stability of Jiangsu power grid[J]. Power Capacitor & Reactive Power Compensation,2021, 42(4):41-46.
朱瑛,秦立宽,颜全椿,等.考虑频率响应过程的风储联合调频策略及储能系统优化配置方法[J].电力自动化设备,2021,41(10):28-35.
ZHU Ying,QIN Likuan,YAN Quanchun,et al. Windstorage combined frequency regulation strategy and optimal configuration method of energy storage system considering process of frequency response[J]. Electric Power Automation Equipment,2021,41(10):28-35.
董天翔,翟保豫,李星,等.风储联合系统参与频率响应的优化控制策略[J].电网技术,2022,46(10):3980-3988.
DONG Tianxiang,ZHAI Baoyu,LI Xing,et al. Optimal control strategy for combined wind-storage system to participate in frequency response[J]. Power System Technology, 2022,46(10):3980-3988.
孙广宇,胡姝博,谢赐戬,等.基于典型风电场景的风储协同频率支撑容量优化配置[J].电力电容器与无功补偿,2024,45(6):108-118.
SUN Guangyu,HU Shubo,XIE Cijian,et al. Optimization configuration of wind storage collaborative frequency support capacity based on typical wind power scenarios[J]. Power Capacitor & Reactive Power Compensation,2024, 45(6):108-118.
李俊,任冲,樊国旗,等.基于模糊控制的高占比风电系统自适应虚拟惯量及调频参数补偿策略研究[J].电力电容器与无功补偿,2021,42(4):55-61.
LI Jun,REN Chong,FAN Guoqi,et al. Study on adaptive virtual inertia and frequency modulation parameter compensation strategy of high proportion wind power system based on fuzzy control[J]. Power Capacitor & Reactive Power Compensation,2021,42(4):55-61.
刘刚,张芳影,李晓峰,等.提升新能源场站调节能力的储能优化配置策略[J].电力电容器与无功补偿,2025, 46(2):62-72.
LIU Gang,ZHANG Fangying,LI Xiaofeng,et al. Energy storage optimization configuration strategy for enhancing regulation capacity of new energy stations[J]. Power Capacitor & Reactive Power Compensation,2025,46(2):62-72.
贾一凡,安海舰,周敏刚,等.电化学储能电站研究现状综述[J].电力电容器与无功补偿,2025,46(3):99-105.
JIA Yifan,AN Haijian,ZHOU Mingang,et al. Review of current research status for electrochemical energy storage power station[J]. Power Capacitor & Reactive Power Compensation,2025,46(3):99-105.
聂春元,李锴. 2009年华中电网统调机组一次调频试验分析[J].华中电力,2009,22(6):23-26.
NIE Chunyuan,LI Kai. Primary frequency regulation analysis for generators of central China power grid in 2009[J]. Central China Electric Power,2009,22(6):23-26.
孙骁强,程松,刘鑫,等.西北送端大电网频率特性试验方法[J].电力系统自动化,2018,42(2):148-153.
SUN Xiaoqiang,CHENG Song,LIU Xin,et al. Test method for frequency characteristics of northwest sending-end power grid[J]. Automation of Electric Power Systems, 2018,42(2):148-153.
孙骁强,刘鑫,程林,等.基于多调频资源协调控制的西北送端大电网新能源快速频率响应参数设置方案[J].电网技术,2019,43(5):1760-1765.
SUN Xiaoqiang,LIU Xin,CHENG Lin,et al. Param eter setting of rapid frequency response of renewable energy sources in northwest power grid based on coordinated control of multi-frequency regulation resources[J]. Power System Technology,2019,43(5):1760-1765.
马晓伟,徐海超,刘鑫,等.适用于西北送端大电网新能源场站快速频率响应功能的入网试验方法[J].电网技术,2020,44(4):1384-1391.
MA Xiaowei,XU Haichao,LIU Xin,et al. A test method for fast frequency response function of renewable energy stations in northwest power grid[J]. Power System Technology,2020,44(4):1384-1391.
孙骁强,刘鑫,程松,等.光伏逆变器参与西北送端大电网快速频率响应能力实测分析[J].电网技术,2017, 41(9):2792-2798.
SUN Xiaoqiang,LIU Xin,CHENG Song,et al. Actual measurement and analysis of fast frequency response capability of PV-inverters in northwest power grid[J].Power System Technology,2017,41(9):2792-2798.
刘洋,邵广惠,张弘鹏,等.新能源参与系统一次调频分析及参数设置[J].电网技术,2020,44(2):683-688.
LIU Yang,SHAO Guanghui,ZHANG Hongpeng,et al. Analysis of renewable energy participation in primary frequency regulation and parameter setting scheme of power grid[J]. Power System Technology,2020,44(2):683-688.
孙骁强,高敏,刘鑫,等.风电场参与西北送端大电网频率调节的快速频率响应能力实测与分析[J].南方电网技术,2018,12(1):48-54.
SUN Xiaoqiang,GAO Min,LIU Xin,et al. Measurement and analysis of fast frequency response capability of wind farms participating in frequency regulation of northwest sending-end large power grid[J]. Southern Power System Technology,2018,12(1):48-54.
张梅,李少林,李丹,等.东北电网风电惯量及一次调频实测与分析[J].电网技术,2022,46(4):1624-1631.
ZHANG Mei,LI Shaolin,LI Dan,et al. Measurement and analysis of wind power inertia response and primary frequen cy regulation characteristics in Northeast China power grid[J]. Power System Technology,2022,46(4):1624-1631.
刘春晖,陈鑫跃,陈浩然,等.高精度新能源一次调频测试技术研究[J].中国高新科技,2025(5):56-58.
LIU Chunhui,CHEN Xinyue,CHEN Haoran,et al. Research on the primary frequency modulation test technology of highprecision new energy[J]. China High-tech Industries,2025 (5):56-58.
张军,王瑾然,章叶青.新能源快速频率响应在新能源场站的应用方案研究及工程实践[J].湖北电力,2021,45(4):86-93.
ZHANG Jun,WANG Jinran,ZHANG Yeqing. Application scheme research and engineering practice of new energy fast frequency response in renewable energy station[J]. Hubei Electric Power,2021,45(4):86-93.
并网电源一次调频技术规定及试验导则:GB/T 40595—2021[S]. 2021.
Guide for technology and test on primary frequency control of grid-connected power resource:GB/T 40595—2021[S]. 2021.
风电场接入电力系统技术规定第1部分:陆上风电:GB/T 19963. 1—2021[S]. 2021.
Technical specification for connecting wind farm to power system—Part 1:On shore wind power:GB/T 19963. 1—2021[S]. 2021.
风电场功率控制系统调度功能技术要求:GB/T 40600—2021[S]. 2021.
Technical requirements for dispatching function of wind farm power control system:GB/T 40600—2021[S]. 2021.
风电场功率控制系统技术要求及测试方法:NB/T 10317—2019[S]. 2019.
Technical requirements and test method for wind farm power control system:NB/T 10317—2019[S]. 2019.
风电场并网性能评价方法:NB/T 31078—2022[S]. 2022.
valuation method for grid code compliance of wind farms:NB/T 31078—2022[S]. 2022.
风电场功率调节能力和电能质量测试规程:Q/GDW 10630—2023[S]. 2023.
Test procedure of wind farm power regulation capability and power quality:Q/GDW 10630—2023[S]. 2023.
国家能源局.西北区域电力并网运行管理实施细则[Z]. 2023.