您当前的位置:
首页 >
文章列表页 >
Lightning and Switching Overvoltages for 220kV Booster Substation Busbar After Installation of Series Reactors
POWER CAPACITOR & REACTIVE POWER COMPENSATION | Research on System Application
    • Lightning and Switching Overvoltages for 220kV Booster Substation Busbar After Installation of Series Reactors

    • 220kV升压站母线加装串抗后的雷电及操作过电压计算
    • Shanghai Waigaoqiao Power Generation Co., Ltd., Shanghai 200120, China

      Xi'an University of Science and Technology, Xi'an 710600, China

    • Vol. 47, Issue 2, Pages: 90-97(2026)   
    • DOI:10.14044/j.1674-1757.pcrpc.2026.02.010    

    移动端阅览

  • DING Zhe, WU Jialei, ZHANG Yu, et al. Lightning and Switching Overvoltages for 220kV Booster Substation Busbar After Installation of Series Reactors[J]. Power Capacitor & Reactive Power Compensation, 2026, 47(2): 90-97. DOI: 10.14044/j.1674-1757.pcrpc.2026.02.010.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Simulation Calculation of Lightning and Switching Overvoltages for the 220kV Booster Substation After Installing Series Reactors on Its Busbar
Analysis of the Knotty Problem in Series Reactor Selection
Analysis of Shunt Capacitor Design

Related Author

DING Zhe
ZHAO Yanjun
LEI Qiaoshu
WANG Guoxi
GAO Yang
WEI Wenwen
ZHAO Yanjun
MA Weiyong

Related Institution

Wuxi Sunking Power Capacitor Co., Ltd.
School of Mechanical and Electrical Engineering, Guilin University of Electronic Technology
  苏杭电气科学研究所 江苏吴江215228  
Suhang Electric Science Research Institute, Wujiang Jiangsu
Tangshan Power Supply Company,Hebei Tangshan 0 0 0
0