LI KAI-YU. Failure Analysis of 10kV Assembling Capacitor at a Certain Substation. [J]. Power capacitor & reactive power compensation, 2010, 31(2): 59-62.
LI KAI-YU. Failure Analysis of 10kV Assembling Capacitor at a Certain Substation. [J]. Power capacitor & reactive power compensation, 2010, 31(2): 59-62. DOI: 10.14044/j.1674-1757.pcrpc.2010.02.012.
Failure Analysis of 10kV Assembling Capacitor at a Certain Substation
摘要
论述了220 kV某变电站10 kV 1台集合式电容器
在投运9 s后发生短路爆炸事故
通过对电容器解剖
结合故障录波记录进行认真分析、论证
确定了本次事故是由于集合式电容器壳体内对地主绝缘层存在缺陷而造成在10 kV额定运行电压下绝缘击穿
形成相间短路放电
电弧的高温使绝缘油迅速过热汽化
造成壳体鼓包和爆裂
同时空气已进入箱体内而引起绝缘油燃烧
导致2#电容器完全烧毁。针对事故所暴露出的问题
提出了对集合式电容器应进行DL/T 596-1996标准未规定的绝缘油微水及色谱检测等
这一检测对发现集合式电容器内部主绝缘缺陷是一种十分必要及有效的方法。
Abstract
The paper describes the accident of a set of 10 kV assembling capacitor at a certain 220 kV substation
which exploded after 9 seconds of operation due to short circuit.Through dissection of the capacitor
careful analyses and demonstration of the record of the faults recorder
it is concluded that the defect of the insulating layer between the inner housing and the ground caused insulation breakdown at the 10 kV rated operating voltage
therefore resulting in short-circuit discharge between phases.The high temperature of arc overheats and vaporizes the insulating oil
causing shell bulges and burst.At the same time
air entered the body and resulted in burning of the insulating oil
so the No.2 capacitor was totally burned down.As for the problem revealed by the fault
this paper propose that some such tests as moisture measurement in insulating oil and chromatographic detection etc not specified by the DL/T596-1996 standard should be carried out.This detection is the necessary and effective way in detecting the main insulating defect inside the assembling capacitor.
关键词
集合式电容器绝缘油相间短路油色谱
Keywords
assembing capacitorinsulating oilshort circuit between phasesoil chromatogram