您当前的位置:
首页 >
文章列表页 >
Analysis of a Colony Fusing Failure in 35 kV Shunt Capacitor Bank
更新时间:2024-09-14
    • Analysis of a Colony Fusing Failure in 35 kV Shunt Capacitor Bank

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Vol. 34, Issue 5, Pages: 71-74(2013)
    • DOI:10.14044/j.1674-1757.pcrpc.2013.05.014    

      CLC: TM531.4
    • Published:2013,

    移动端阅览

  • DONG WAN-GUANG, DONG YA, HOU XIAN-FA, et al. Analysis of a Colony Fusing Failure in 35 kV Shunt Capacitor Bank. [J]. Power capacitor & reactive power compensation, 2013, 34(5): 71-74. DOI: 10.14044/j.1674-1757.pcrpc.2013.05.014.

  •  
  •  

0

Views

69

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis on Colony Fusing Failure of Fuses in Shunt Capacitor Bank
Research on Simulation of Switching Re-ignition Over-voltage of Capacitor Bank Based on Series Resistance Switch
A New Method to Suppress the Switching Overvoltage in Shunt Capacitor Bank
Typical Case Analysis for Colony Fusing Failure of Fuses in Shunt Capacitor Bank
Influence of Shunt Reactive Compensation Installation on the Harmonic in Electrified Network

Related Author

HE Man-tang
WANG Wen-hong
YANG Lanjun
WANG Xuesong
YUE Yonggang
LYU Xin
ZHANG Qingru
WANG Chao

Related Institution

Dongguan Power Supply Bureau
  广东电网东莞供电局 广东东莞523120  
School of Electrical Engineering, Xi'an Jiaotong University
Inner Mongolia EHV Power Supply Company
  西安交通大学电气学院 西安710049  
0