Wiring and Configuration Analysis of Shunt Capacitor Bank at 1000 kV Huxi Substation
更新时间:2024-09-14
    • Wiring and Configuration Analysis of Shunt Capacitor Bank at 1000 kV Huxi Substation

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Vol. 36, Issue 1, Pages: 15-20(2015)
    • DOI:10.14044/j.1674-1757.pcrpc.2015.01.004    

      CLC: TM53
    • Published:2015,

    移动端阅览

  • CHANG WEI, ZHU LIANG, CHEN ZHUYI. Wiring and Configuration Analysis of Shunt Capacitor Bank at 1000 kV Huxi Substation. [J]. Power capacitor & reactive power compensation, 2015, 36(1): 15-20. DOI: 10.14044/j.1674-1757.pcrpc.2015.01.004.

  •  
  •  

0

Views

103

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Discussion on Insufficient Reactive Power Compensation by Non-fault Factor
Operation Analysis and Discussion of General Common Problems of AC Filter Capacitor
Analysis on Protection Operation of HVDC Filter
Study on Performance Test of BOPP Film Based on Domestic Particles and Test of High Voltage Capacitor
Transient Over-voltage Suppression Method of New Energy Based on Controllable Transformer

Related Author

YUAN Wen-miao
XU Qing-chuan
LIANG Tian-ming1
LI Bao1
ZHANG Qiang2
LIN Zhan-tao1
YUE Hao1
HE Fang

Related Institution

Weihui Electric Power Equipment Factory,Weihui
Guangzhou Bureau,CSG EHV Power Transmission Company
CSG Power Dispatching & Communication Center
Guangzhou Bureau,CSG EHV Power Transmission Company
Xi’an XD Power Capacitor Co., Ltd.
0