Study on Power Supply Scheme for 10 kV Run-through Long Distance of Golmud-Korla Railway
This paper analyzes the no-load and heavy load power supply of long distance 10 kV runthrough electric power line. When no-load
the terminal voltage of the line is increased
but it is very small
which has little influence on the power supply. The article focuses on the analysis of the phenomenon that the terminal voltage drop exceeds the specifications criterion during heavy load in long distance 10 kV run-through line
and puts forward a scheme for setting up series capacitor compensation.It is found that in the design process designers always pay close attention to the voltage end of the line
but pay no attention to the voltage of the line where mount the series capacitor equipment. At last the problem is analyzed by simulation
and the method and idea of solving the problem are put forward.
关键词
贯通线长距离供电串联电容器电压
Keywords
run-through electric power lineextra long distance power supplyseries capacitorvoltage