您当前的位置:
首页 >
文章列表页 >
Study on Power Supply Scheme for 10 kV Run-through Long Distance of Golmud-Korla Railway
更新时间:2024-09-14
    • Study on Power Supply Scheme for 10 kV Run-through Long Distance of Golmud-Korla Railway

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Vol. 38, Issue 3, Pages: 89-94(2017)
    • DOI:10.14044/j.1674-1757.pcrpc.2017.03.016    

      CLC: U223.5
    • Published:2017,

    移动端阅览

  • TIAN SHIJI. Study on Power Supply Scheme for 10 kV Run-through Long Distance of Golmud-Korla Railway. [J]. Power capacitor & reactive power compensation, 2017, 38(3): 89-94. DOI: 10.14044/j.1674-1757.pcrpc.2017.03.016.

  •  
  •  

0

Views

56

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

The Concentrated Filtering of Multiple Harmonics Loads and Voltage Harmonics and Reactive Power comprehensive Control
The Research of Series Capacitor
Influence of Temperature, Voltage, Harmonic and Inrush Transient Current on Power Capacitor Life Expectancy
Optimization of Type Tests Circuit about Series Capacitor
Splitting Layer Control of Harmonics for Regional Notwork and Concentrated Control to Multi-harmonics Sources

Related Author

Du Xiaoping
Liu Wanzhi
Li Huaiyu
SHEN Wen-qi
LI Wei-bo
MAO Cheng-xiong
ZUO Qiang-lin
ZHANG Jian-ping

Related Institution

Lishui Power Supply Company
ABB Xi’an Power Capacitor Company Ltd., 469 Daqing Road
  西安ABB电力电容器有限公司 西安 710082  
Xi′an Power Capacitor Research Institute, Xi′an
College of Electrical & Electronic, Huazhong University of Science and Technology Wuhan
0