SI WENRONG, FU CHENZHAO, HUANG HUA, et al. Monitoring and Transient Component Extraction for Overvoltage Waveform of 500 kV Power Grid. [J]. Power capacitor & reactive power compensation, 2017, 38(5): 108-113.
SI WENRONG, FU CHENZHAO, HUANG HUA, et al. Monitoring and Transient Component Extraction for Overvoltage Waveform of 500 kV Power Grid. [J]. Power capacitor & reactive power compensation, 2017, 38(5): 108-113. DOI: 10.14044/j.1674-1757.pcrpc.2017.05.021.
Monitoring and Transient Component Extraction for Overvoltage Waveform of 500 kV Power Grid
即含暂态过程的原始波形与数值逼近得到的50 Hz工频电压拟合波形相减得到暂态分量时域波形。监测系统已于华东电网500 k V瓶窑站挂网长期运行
对记录获取的典型操作、雷电过电压波形进行暂态分量提取分析
结果表明该监测系统及分析技术在现场应用的可靠性和实用性。
Abstract
In view of the actual situation that the present 500 kV grid is lack effective monitoring measures
in this paper
a kind of design method of overvoltage waveform data monitoring system based on the non-inductive capacitive unit to form into voltage divider which is embedded in the capacitor voltagetransformer is introduced. The monitoring system adopts ARM7 CPU processor to develop high speed wideband voltage monitoring device to record
store and transmit the waveform data of overvoltage. Andaccording to the actual conditions
the transient component extraction algorithm is developed for theengineering application
the transient component can be obtained by the original waveform subtracting thenumerical approximation fitting 50 Hz power voltage. The monitoring system has been put into long termlive operation at 500 k V Pingyao substation in East China Power Grid. The typical switch and lightningovervoltage waveforms recorded are analyzed by the use of transient component extraction algorithm. Theresults show both reliability and practicability of the monitoring system and analysis technology at site.
关键词
500 kV过电压监测电容式电压互感器(CVT)暂态分量波形提取
Keywords
500 kVovervoltage monitoringcapacitor voltage transformer(CVT)transient componentwaveform extraction