Practical and Simplified Calculation Method and Case Analysis on Reactive Power Balance Allocation for 500 kV Substation
更新时间:2024-09-14
    • Practical and Simplified Calculation Method and Case Analysis on Reactive Power Balance Allocation for 500 kV Substation

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Vol. 39, Issue 1, Pages: 1-6(2018)
    • DOI:10.14044/j.1674-1757.pcrpc.2018.01.001    

      CLC: TM63;TM714.3
    • Published:2018,

    移动端阅览

  • WEI PENG, ZHOU QIAN, CHEN ZHE, et al. Practical and Simplified Calculation Method and Case Analysis on Reactive Power Balance Allocation for 500 kV Substation. [J]. Power capacitor & reactive power compensation, 2018, 39(1): 1-6. DOI: 10.14044/j.1674-1757.pcrpc.2018.01.001.

  •  
  •  

0

Views

96

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis on the Reactive Power Compensation of Substation
Reactive Compensation Analysis of35 kV and the Below Substation and Line
Optimal Allocation of Reactive Compensation of Renewable Power System Considering Voltage-dominated Cascading Faults
Analysis on Capacitor Switching Control Module Oriented to Distribution Panel Area
Research on Distributed Reactive Power Compensation Technology and Application of Bidirectional Converter in Rail Transit Power Supply System

Related Author

LIU Ya
YAO Ming
XU Tao
ZHAO Xiaomin
SHAN Xiaoyu
LI Site
ZHENG Lingfeng
ZHOU Yongzhi

Related Institution

Yi Yang Power Survey and Design Institute Co.,Ltd.
Huishui Power Supply Bureau,Huishui
State Grid Inner Mongolia Eastern Electric Power Co., Ltd., Electric Power Research Institute
Polytechnic Institute of Zhejiang University
Shanghai Zhixin Electric Co, Ltd
0