您当前的位置:
首页 >
文章列表页 >
Operation & Maintenance Improvement Measures for Operation Reliability of High Voltage Shunt Capacitor Complete Sets
更新时间:2024-09-14
    • Operation & Maintenance Improvement Measures for Operation Reliability of High Voltage Shunt Capacitor Complete Sets

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Vol. 39, Issue 2, Pages: 1-5(2018)
    • DOI:10.14044/j.1674-1757.pcrpc.2018.02.001    

      CLC: TM53
    • Published:2018,

    移动端阅览

  • ZHANG JIANJUN, LI XUE, LI YAN. Operation & Maintenance Improvement Measures for Operation Reliability of High Voltage Shunt Capacitor Complete Sets. [J]. Power capacitor & reactive power compensation, 2018, 39(2): 1-5. DOI: 10.14044/j.1674-1757.pcrpc.2018.02.001.

  •  
  •  

0

Views

117

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Selected Sequence of High Voltage Capacitor Installation Connection Ways from Statistical Data
The Contrast Between Discharge Coil and Voltage Transformer
On-site Test for the Protection of High Voltage Shunt Capacitor
Theoretical Analysis on Withstanding Short Circuit Discharge Test and Inrush Current Capacity of Internal Fuse
Protection Setting on High Voltage Shunt Capacitor

Related Author

HUA Shui-rong~1
WANG Min~3
ZHAO Qi-cheng~2
YANG Chang-xing~1
ZHOU Guo-liang
王敏
赵启承
杨昌兴

Related Institution

  杭州310007  
  杭州3100143  
  苏杭电气科学研究所 江苏吴江215228  
Zhejiang Electric Power Company
Zhejiang Electric Power Test and Research Institute
0