您当前的位置:
首页 >
文章列表页 >
Discussion on Solutions to Improve Success Rate of Switching Capacitor Banks by AVC System for Chongqing Power Grid
更新时间:2024-09-14
    • Discussion on Solutions to Improve Success Rate of Switching Capacitor Banks by AVC System for Chongqing Power Grid

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Vol. 39, Issue 4, Pages: 76-80(2018)
    • DOI:10.14044/j.1674-1757.pcrpc.2018.04.014    

      CLC: TM53
    • Published:2018,

    移动端阅览

  • DANG XIAOYU, WANG CHENGNIAN, LI DEZHI, et al. Discussion on Solutions to Improve Success Rate of Switching Capacitor Banks by AVC System for Chongqing Power Grid. [J]. Power capacitor & reactive power compensation, 2018, 39(4): 76-80. DOI: 10.14044/j.1674-1757.pcrpc.2018.04.014.

  •  
  •  

0

Views

79

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Influence of Operating Mechanism’s Performance of Vacuum Circuit Breaker on the Re-ignition of Switching Capacitor Bank
Design of Dynamic Model Platform for Offshore Wind Farm Interconnection via Flexible Low-frequency AC Transmission System
Simulation Model and Disturbed Characteristics of Grid-forming STATCOM/BESS
The New Problems Come from Capacitor Bank with Microcomputer protection
Analysis of Failures of Relay Protection Installation for Capacitor Bank in Xing cheng Substation

Related Author

LYU Dan
HONG Jinqi
SHAO Zhiming
SHI Mingming
SHEN Yong
XIA Rong
WANG Guodong
YAN Jun

Related Institution

Shaoxing Electric Power Equipment Set Company
Shaoxing Daming Electic Power Construction Company Limited Power Supply and Distribution Services Branch
State Grid Shaoxing Power Supply Company
State Key Laboratory of HVDC, Electric Power Research Institute
Zhuhai Power Supply Bureau of Guangdong Power Grid Co., Ltd.
0