A large number of reactive power are needed to be supplemented in the operation of rectifier station and inverter station in the HVDC project and
at the same time
the harmonic of converting device generated in the operation can cause reduction of power quality and interference of communication system.Therefore
the filter with corresponding capacity is needed to be installed on both AC and DC side for the reactive compensation and harmonic compression.AC filter is an important and indispensable part of UHVDC converter stations.For assuring smooth commissioning of AC filter at converter station
the EMTPE program is used to predict overvoltage of 750 kV AC filter.During the commissioning at AC site of certain converter station
12 groups of AC filter are subject to the switching test respectively.The insulation
protection and switching feature of the AC filter are checked by the test
and the data in the test is record and analyzed.It is shown by the simulation that the simulation calculation and the actual measurement are basically in agreement.The closing resistor of 750 kV circuit breaker
in case of removal from operation
has a definite influence on the inrush current of filter.