您当前的位置:
首页 >
文章列表页 >
Simulated Calculation and Measurement Analysis on Switching of 750 kV AC Filter at Converter Station
更新时间:2024-09-14
    • Simulated Calculation and Measurement Analysis on Switching of 750 kV AC Filter at Converter Station

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Vol. 41, Issue 1, Pages: 91-95(2020)
    • DOI:10.14044/j.1674-1757.pcrpc.2020.01.015    

      CLC: TN713;TM721.1
    • Published:2020,

    移动端阅览

  • LI SHAN, YANG DINGQIAN. Simulated Calculation and Measurement Analysis on Switching of 750 kV AC Filter at Converter Station. [J]. Power capacitor & reactive power compensation, 2020, 41(1): 91-95. DOI: 10.14044/j.1674-1757.pcrpc.2020.01.015.

  •  
  •  

0

Views

106

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis on Accident Expansion by Mal-closing Capacitor Bank
Feasibility Analysis on Reconstruction of HP11/13 AC Filter Capacitors at Yidu Converter Station
Study on Fault Warning of AC Filter at Converter Station Based on RBF Neural Network
Study and Application of AC Capacitor Tower’s Anti-bird Damage Measures at UHVDC Converter Station
Simulation Analysis and Test Study on Switching of Shunt Capacitor Device

Related Author

HUANG Hua-sheng
HUANG Rong
CAI Mei-feng
CHEN Fei
LIU Xun
WU Jian-bo
RAO Hong-lin
LIU Zhiyuan

Related Institution

Fujian Nanan City Electric Power Co.,Ltd.,Nanan
Hubei EHV Transmission & Substation Company
Key Laboratory of Control of Power Transmission and Conversion Ministry of Education,Shanghai Jiaotong University
Shanghai Jiaotong Power Technology Co.,Ltd.
State Grid Ningxia Power Corporation Maintenance Company
0