您当前的位置:
首页 >
文章列表页 >
Calculation Method of Transient Voltage Rise after UHVDC Complete Blocking
更新时间:2024-09-14
    • Calculation Method of Transient Voltage Rise after UHVDC Complete Blocking

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Vol. 41, Issue 1, Pages: 184-190(2020)
    • DOI:10.14044/j.1674-1757.pcrpc.2020.01.029    

      CLC: TM721.1
    • Published:2020,

    移动端阅览

  • XIN CHAOSHAN, YIN CHUNYA, LI FENGTING, et al. Calculation Method of Transient Voltage Rise after UHVDC Complete Blocking. [J]. Power capacitor & reactive power compensation, 2020, 41(1): 184-190. DOI: 10.14044/j.1674-1757.pcrpc.2020.01.029.

  •  
  •  

0

Views

110

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Transient Over-voltage Suppression Method of New Energy Based on Controllable Transformer
Optimal VAR Compensation Capacity for Mines and Factories
Several Problems of Development and Application of Reactive Power Local Compensation Equipment for High-voltage Electric Motor
New Design Technique of Reactive Power and Harmonic Automatic Compensation Equipment
Research on Transient Overvoltage Caused by Switching on/off Shunt Capacitor Bank

Related Author

KE Xianbo
CHENG Lin
XIA Chuanlin
ZHAO Rongzhen
WEI Lin
REN Chong
王凤霞
潘本琦

Related Institution

NARI Electric Co., Ltd.
Northwest Branch of State Grid Corporation of China
  安徽电力试验研究所 安徽合肥230022  
Anhui Electric Power Test and Research Institute
  上海201901  
0