您当前的位置:
首页 >
文章列表页 >
Study on Operation Optimization Strategy of New Generation Phase Modifier of Shaoshan Converter Station Under Incomplete Phase State
更新时间:2024-09-14
    • Study on Operation Optimization Strategy of New Generation Phase Modifier of Shaoshan Converter Station Under Incomplete Phase State

    • POWER CAPACITOR & REACTIVE POWER COMPENSATION   Vol. 41, Issue 3, Pages: 32-36(2020)
    • DOI:10.14044/j.1674-1757.pcrpc.2020.03.006    

      CLC: TM732
    • Published:2020,

    移动端阅览

  • XU HAO, WANG ZIYI, CHEN SHENGCHUN, et al. Study on Operation Optimization Strategy of New Generation Phase Modifier of Shaoshan Converter Station Under Incomplete Phase State. [J]. Power capacitor & reactive power compensation, 2020, 41(3): 32-36. DOI: 10.14044/j.1674-1757.pcrpc.2020.03.006.

  •  
  •  

0

Views

56

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

No data

Related Author

No data

Related Institution

No data
0