balancing and assembly of shunt capacitor installation for Fulong converter station of Xiangjiaba—Shanghai ±800 kV UHVDC transmission project are mainly summarized.It is shown
through structural analysis
characteristic introduction
theoretical analysis in wind and seismic resistance
balancing and assembly of the capacitor installation etc
that shunt capacitor installation for Fulong converter station has reasonable structural design
big safety factor of insulation coordination
sufficient strength and rigidity in structures and meets the requirements of wind and seismic resistance in the region.The quality of shunt capacitor is guaranteed by the advanced production facilities and process.The progress on noise reduction of the product is made by way of effective noise reduction measures.The production and assembly become more convenient by way of flexible and effective balancing methods.