1. 国网河北省电力有限公司经济技术研究院
2. 清华大学电机系电力系统及发电设备控制和仿真国家重点实验室
纸质出版日期:2020,
移动端阅览
[1]袁博,张雪敏,张至美.考虑无功源容量约束的无功分区方法[J].电力电容器与无功补偿,2020,41(01):59-65+71.
YUAN BO, ZHANG XUEMIN, ZHANG ZHIMEI. Reactive Partitioning Method Considering Var Source Capacity Constraints. [J]. Power capacitor & reactive power compensation, 2020, 41(1): 59-65.
[1]袁博,张雪敏,张至美.考虑无功源容量约束的无功分区方法[J].电力电容器与无功补偿,2020,41(01):59-65+71. DOI: 10.14044/j.1674-1757.pcrpc.2020.01.010.
YUAN BO, ZHANG XUEMIN, ZHANG ZHIMEI. Reactive Partitioning Method Considering Var Source Capacity Constraints. [J]. Power capacitor & reactive power compensation, 2020, 41(1): 59-65. DOI: 10.14044/j.1674-1757.pcrpc.2020.01.010.
无功分区是大规模电网提高无功电压管理的鲁棒性和灵活性的重要措施。虽然
基于复杂网络社团结构的方法为无功分区这个NP难题的求解提供了便捷高效的算法
但是这类方法未能有效处理无功源的容量约束
因此分区结果存在与无功电压控制需求不够一致的问题。为此
本文首先建立无功源平抑受控节点无功变化的控制灵敏度矩阵;之后结合无功源控制容量约束和无功源耦合程度给出了预分区方法
避免初始分区过大超过无功源控制能力的情况;继而
建立以无功传输效率为权重的加权模块度指标
以量化无功分区平衡的程度
避免在分区内出现远距离的无功输送通道。最后
在某省级实际电网规划方案中验证了该方法的有效性。算例表明
本文提出的无功分区结果更加合理
并有利于指导我国实际电网未来的无功源规划与建设。
Network reactive partitioning is an important measures to improve the robustness and flexibility of reactive power management in large-scale power grids.Although the method based on complex network community structure provides a convenient and efficient algorithm for solving the NP problem of network partitioning
yet this kind of method does not effectively deal with the capacity constraints of var sources.Therefore
the problem that the partitioning result is not in agreement with voltage control requirement exists.For solving this problem
in this paper
the control sensitivity matrix of var source to suppress the influence of reactive power change of load nodes is set up firstly.Then
the pre-partitioning method
considering the capacity constraints and coupling degree of var source
is given so to avoid too large initial partitions which exceed reactive control ability.After that
a revised modularity with reactive power transmission efficiency as weight is proposed to quantify the degree of reactive power balancing and to avoid the occurrence of longdistance reactive transmission within sub regions.Finally
the effectiveness of the proposed method is verified in the planning scheme.It is shown by the calculation example that the partitioning result proposed in this paper is more reasonableis helpful to guide planning and construction of var source of actual power grid in the future.
无功分区无功电压控制复杂网络模块度
power network partitionreactive power-voltage controlcomplex networkmodularity