XU HAO, WANG ZIYI, CHEN SHENGCHUN, et al. Study on Operation Optimization Strategy of New Generation Phase Modifier of Shaoshan Converter Station Under Incomplete Phase State. [J]. Power capacitor & reactive power compensation, 2020, 41(3): 32-36.
XU HAO, WANG ZIYI, CHEN SHENGCHUN, et al. Study on Operation Optimization Strategy of New Generation Phase Modifier of Shaoshan Converter Station Under Incomplete Phase State. [J]. Power capacitor & reactive power compensation, 2020, 41(3): 32-36. DOI: 10.14044/j.1674-1757.pcrpc.2020.03.006.
the operation optimization scheme on phase modifier under incomplete phase condition is proposed from such two aspects as protection and control on the basis of describing the outline of phase modifier of Shaoshan converter station and analyzing incomplete phase test and result of adjustment site of phase modifier of the converter station.The scheme proposed in this paper can solve the problem that the incomplete phase protection can’t respond to the incomplete phase state in time when the reactive power output is low
which is of great benefit to avoid the damage of the instantaneous large reactive power of condensers under the incomplete phase state.It is hoped that it can provide useful reference for engineering practice and related electrical workers.