1. 四川大学电气工程学院
2. 中国电力工程顾问集团西南电力设计院有限公司
3. 国网四川省电力公司成都市双流供电分公司
纸质出版日期:2021,
移动端阅览
周步祥, 杨晶杰, 刘治凡, 等. 基于改进状态转移算法的电力系统两阶段动态无功优化[J]. 电力电容器与无功补偿, 2021,42(6):22-30.
ZHOU BUXIANG, YANG JINGJIE, LIU ZHIFAN, et al. Two Stage Dynamic Reactive Power Optimization of Power System Based on Improved State Transition Algorithm. [J]. Power capacitor & reactive power compensation, 2021, 42(6): 22-30.
周步祥, 杨晶杰, 刘治凡, 等. 基于改进状态转移算法的电力系统两阶段动态无功优化[J]. 电力电容器与无功补偿, 2021,42(6):22-30. DOI: 10.14044/j.1674-1757.pcrpc.2021.06.003.
ZHOU BUXIANG, YANG JINGJIE, LIU ZHIFAN, et al. Two Stage Dynamic Reactive Power Optimization of Power System Based on Improved State Transition Algorithm. [J]. Power capacitor & reactive power compensation, 2021, 42(6): 22-30. DOI: 10.14044/j.1674-1757.pcrpc.2021.06.003.
针对混合整数非线性规划的电力系统动态无功优化问题
提出两阶段动态无功优化模型以降低计算规模。第1阶段为非线性规划
以系统网损和节点电压偏移综合最小为目标。第2阶段为混合整数规划
在满足设备全天调节次数等约束的基础上
以电力系统网损增量最小为目标。鉴于常规罚函数法处理约束条件会出现罚因子选取不当而影响最终结果的情况
提出混合滤子技术的改进状态转移算法。该算法采用双种群并行搜索方式
将个体适应度和约束违反度构成滤子对作为评价指标以替代罚函数。最后
以IEEE 14节点系统和某地级电网实际系统为例
将所提算法、传统状态转移算法和多种群蚁群算法分别求解模型
通过对比分析仿真结果验证了所提模型与算法的正确性。
For the dynamic reactive power optimization of power system with mixed integer nonlinear programming
a two-stage dynamic reactive power optimization model is proposed to reduce the calculation scale. The first stage is nonlinear programming and the minimizing power system loss and node voltage deviation are taken as target. The second stage is mixed integer programming and the minimum increment of of power system loss as the target on the basis of meeting the constraints such as adjustment number of equipment in the whole day. In consideration of such situation that the conventional penalty function method is used to deal with the constraints will affect the final result due to improper selection of penalty factors
an improved state transition algorithm mixed filter technique is proposed. In this algorithm
two population parallel search method is used and filter pairs composed of individual fitness and constraint violation are used as evaluation indexes instead of penalty function. Finally
taking IEEE 14 node system and a real power system of local level network as examples
the proposed algorithm
traditional state transition algorithm and multiple ant colony algorithm are used to solve the model respectively. The correctness of the proposed model and the algorithm is verified by the calculation results.
混合整数非线性规划动态无功优化两阶段滤子技术状态转移算法
mixed integer nonlinear programmingdynamic reactive power optimizationtwo-stagefilter techniquestate transition algorithm
0
浏览量
19
下载量
0
CSCD
关联资源
相关文章
相关作者
相关机构
京公网安备11010802024621